Customization: | Available |
---|---|
Certification: | ISO |
Standard: | Jc/T587 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
For the large FRP tank that can not be transported on road (diameter is larger than 4000mm), we can send our workers and equipment to appointed site for manufacturing.
Manufacturing flow process:
I Contract reviewing stage | Contract signing | Preparation by workshop | Transportation to site, including: | Manufacturing on site | Acceptance |
1 Confirm the volume | 4 Purchase the materials | 7 Persons | 13 Preparation of foundation | 19 Inspection and test | |
2 Confirm the accessories | 5 Prepare the equipment and mould | 8 Equipment | 14 Liner making by spraying process | 20Acceptance | |
3 Confirm the assistant materials | 6 Make the accessories | 9Mould | 15 Winding work | 21 Leave | |
10 Accessories | 16 Curing | ||||
11 Raw materials | 17 Accessories assembly | ||||
12 Other outsourcing parts | 18 Installation of others |
Based on the site condition, vertical winding and horizontal winding can be chosen.
Large FRP tanks manufactured on site are suitable to store a series chemical liquids, such as hydrochloric acid, sulfuric acid, phosphoric acid, nitric acid, organic acid, fluosilicic acid, hydrofluoric acid, brine, sewage, sea water, potable water, ect.
Standard accessories include: manhole, inlet, outlet, drain hole, imbedded part of anchor
Optional accessories include: liquid meter, ladder, handrail, anti-skidding layer, water seal tank, other accessories agreed.
Materials properties please see "HYX"2.1.